2019 HS Facility Auditorium
- Current space is in need of many significant upgrades including curtains, seating, and lighting.
- No present dressing rooms
- Minimal space for prop prep and storage
- Minimal backstage space.
- Not practical – a new 400 seat theater – $9 million
- Renovating our current gymnasium into a 460-seat theater – $2.2 million
- Re-purpose existing locker rooms as dressing room spaces
- Heating, cooling system infrastructure and restrooms already in place